Galictio designs and rides metallic station in Navantia Fene

  • Up to 100 TN of scaffolding.
  • An average of 15 workers.
  • Installation of mobile unit to encapsulate monopile flange and metalize on the outside, incorporating lateral stabilizers on rails to move unit two meters. Encapsulation with protective material and covered with galvanized steel sheet.
  • Maintenance and coordination personnel for all incoming and outgoing movements of parts during the project.