Galictio designs and sets three cabins for Windar in Avilés for the Vineyard project

Up to 500 TN of scaffolding.

An average of 25 operators, reaching peaks of 40.

Instalación de 3 cabinas de pintura con encapsulamiento total, panel frontal desmontable con material protec y cubiertas deslizables.

Maintenance and coordination personnel for all movements in and out of parts from the cabins during the project.