Galictio designs and mounts 2 cabins for East Anglia 3. Windar Avilés

  • Up to 500 TN of scaffolding.

  • An average of 25 operators, reaching peaks of 40.

  • Installation of 2 paint booths with total encapsulation, removable front panel with protection material and sliding covers.

  • Maintenance and coordination personnel for all movements in and out of parts from the cabins during the project.